The goal of this project was to replace a deteriorating wood marina that was constructed in the 1970’s. The new 235-slip marina, located on Bainbridge Island, was constructed in two phases to accommodate on-going use and occupancy of the marina during the construction process. We designed the pier extension and floating dock system.