This project consists of approximately 700 linear feet of trenches within an existing manufacturing facility. Sitts & Hill designed pits with concrete bases and both concrete and sheet pile walls to withstand soil pressures and equipment loads. Sitts & Hill also designed steel beams spanning across the pits to support equipment.