Boeing is endeavoring to minimize the potential of pollutant contamination in stormwater from the MDC and DC campuses. To this end, Sitts & Hill has completed design of PCB and zinc stormwater treatment facilities for these sites. Besides the treatment systems, designs also include ancillary site improvements to accommodate the new storm systems.
• Civil (Prime) / Survey / Structural / Landscape
• Sub-consultants include storm treatment specialist, electrical, mechanical
• MDC: ~9 months design; ~11 months construction; on-schedule
• DC: on-going design and construction; mid-2024 completion